Construction:

First of all, on the basis of the ground to the construction site of the ground roughness, hardness, strength, humidity and moisture, and other relevant environmental requirements are as follows:
※ surface roughness: 2 m ruler demands within the framework of flatness should be less than 2mm-3mm.
※ hardness: the hardness of not less than the surface of the grass-roots ⒈ 2 MPa.
※ strength: the strength of concrete below the standard C-20 requirements.
※ humidity: the grass-roots level is less than 8% moisture content.
※ humidity environment: room temperature and ground temperature of 15 degrees is appropriate. 5 degrees below and above 30 degrees for the environment can not work.
※ indoor relative humidity should be maintained at 20% -75%.

Ground-based grinding:
→ pre-construction ground to check whether from the shell, or a prominent indentation on the ground, such as cracks, if this is necessary to carry out repair, grinding, ground-based formation, humidity can not be greater than 8% of the construction.
→ grinding purpose: to organize Ping, to remove pollution, on the basis of a prominent bump on the ground should be the focus of grinding, grinding on the ground after the ruler should be controlled within 2m to 2.5mm ruler, with no defects in the above-mentioned hair. For the grass-roots level lower ground, recommend the use of self-leveling cement material on the ground for processing. In order to achieve the desired results.

Self-leveling cement works:
※ deal with Prime coating: Prime coating on the ground prior to use suction vacuum cleaner to clean and dust can not have a criminal record. Prime coating may be appropriate in accordance with the proportion of Duishui. Prime coating on the uniform to be painted, can not be missed Tu, brushing horizontal to vertical, not the basis on the ground to a multi-coated. Prime coating on after 1-2 hours before they can do self-leveling.
※ self-leveling construction: Stir into the first self-leveling drums and add the appropriate amount of water, stirring evenly blender, mixing good self-leveling scraper Guaping uniform, with at the same time drive around gas cylinder gas back and forth in time in order to self-leveling air emissions , The stem further 24 hours, and then grinding grinding machine, vacuum cleaner to shop before the note on the floor.

PVC sheet pavement
※ coating glue adhesives: Adhesives used to saw-blade coating uniformity in dealing with the good on the floor, place an appropriate time to put up on the floor.
※ Putie floor: Glue on the floor made to participate fully placed the time, for posting on the floor. At the same time to avoid the occurrence of air bubbles. Stick out the use of pressure (carpet rolled side of the wood) or soft wood for the exhaust. The use of 100 pounds pressure pulley, careful Crimping, pressure-adhesive hate Salisbury.
※ joint deal with: Using special joints to deal with welding rods hot air welding method of construction, walls use a strong solution of the sealant construction method of construction.
※ gully: the need to use some of the joints cutter or cut-U-V. To ensure that the depth of the groove is on the floor of the thickness of 1/2-2/3.
※ fusion: the use of hot air welding machine for welding. Full use of heat, melting the protruding part of the welding rods. Weld's Department of finishing: The Blade after the removal of welding part of the surplus. Welding rods to be used to cool shovel knife to cut a smooth surface.

Floor maintenance:
※ improve the appearance of: the timely removal of day-to-day use of the resulting dirt, so that the full floor to show their extraordinary appearance and natural gloss.
※ to protect the floor: the floor so that the chemicals from the accident, traces of cigarette Xie Yin, oil and water erosion. On the floor so that their durability can be fully tapped. Will be on the surface of the mechanical wear is approaching a minimum.
※ convenient care: As the floor itself and its close and special surface structure of the deal, pay attention to day-to-day maintenance so that Clean the floor easy to care, to extend the service life.
※ the end of the construction and maintenance of clean: screw very dry wet clean cloth.
※ day-to-day care: the use of dust mop to carry out day-to-day dust drag swab, if necessary, hit the floor wax.
※ care on a regular basis: every 6 months to 12 months to carry out a new deal with wax.